Durat Elneel

03

Durat Elneel is one of the most important projects of Mondial Group which will raise the profile of real estate development projects in Sudan. It is located in the “Mansheya” neighborhood overlooking the Nile Street near the Tower of the National Authority for Communications, in an area that considered as one of the finest and most beautiful in Khartoum. The project is composed of two towers with a total  built  area of ​​38.822 square meters, in a total land area of 3.053 square meters, The first tower comes as  a residential building with a in a total  built area of 30.342 square meters and a 23 storey high .The second tower comes as commercial building with a built area of 8480 square meters, a 20 storey high.

BUTTON-READMORE-1

 


Road Nyala Aadalersan

DSC02106In a distinguished step in the company activities, it was able during the year 2010 to sign a major contract with the Ministry of Roads and Bridges for a road implementation which links Sudan with Central Africa Republic, the length of the road in the first phase about 160 km from Nyala – Id Alfursan – Rihaid Albirdi till Um Dafougue on the borders of Sudan with Central Africa Republic. This stage was also estimated by 160 kilometers.At an early time the company started preparations for the road through ample investment in mechanics and equipment’s, as well as providing work facilities, work vehicles and supervision. The company began the work of the soil sampling examination and road cleaning. M.A.N. Infrastructure is now working at an accelerated pace in the project with the hope to be completed before the deadline that is 36 month.Hopefully after the completion of the road implementation Man for infrastructure, the company will gain a higher level of experience in the field of road establishment and will be in a position to take on many projects that will be posed by the Sudanese Government in the future.


Presidential Villas:-

vilaA fist class presidential residential complex at a total area of 25000 ft sq, containing 40 villas at an area of 615 ft sq for each villa as well as it  contains many green lands, gardens, leisure and recreation premises, walking lanes, healthy club, telecommunications and separate waste process unit.


Ethanol Factory (Kenana Sugar Company):-

SAMSUNG DIGIMAX A403

Type of Work: Works and operations of the project: excavation works, soil replacement works, supply, install, insulations, accurately executing reinforced concrete, in addition to performing many electro-mechanical systems inside the project.This project is considered the first ever factory for producing ethanol extracted from sugar can to use this substance as bio-fuel.


Wahat al Khartoum

Untitled-2First phase: Starting Date: 2006. Finishing Date: 2007.
Type of work: a subcontractor of Dan video Engineering for concrete works. Area of the project: 100.000 m sq.
Description of work:The company has completed the structure works (Skelton) for two towers among the four towers of the project.

Second phase:Starting Date: 2007.Finishing Date: 2008.
Type of works: Main contractor for building works (block).

Third phase:Starting Date: 2007 Finishing Date: 2008.
Type of work: a subcontractor of TEC (Turkish Emirates Co.) to complete finishing works.


Numbers-1-filled-icon Numbers-2-filled-icon Numbers-3-filled-icon Numbers-4-filled-icon